The contract covers construction of railway platform № 2 URDA, Tallinn. The following works will be performed during the construction process:
1) Base preparation for installation of reinforced concrete mounting slabs
2) Installation of reinforced concrete mounting slabs
3) Earth backing inside the railway platform
4) Installation of foundations for lighting columns
5) Base preparation for installation of the upper slabs and laying down of paving blocks
6) Installation of upper slabs
7) Laying down of paving blocks
8) Installation of step ladders
9) Construction of paths and ramp to the platform
10) Landscape design performance

Project Details

  • Category: Building
  • Client: GOTRACK OÜ
  • Project Name: Construction of railway platform № 2 URDA, Tallinn
  • Сountry: Estonia
  • Address: URDA, Tallinn
  • Start Date: April 2021
  • End Date: June 2021